TIMELINE
home  |  support  |  the next stage  |  timeline
The Next Stage Campaign was launched five years ago as a vehicle to realize Arena’s long-term vision for a new home. There have been a number of milestones along the way, preceding the quiet phase of the Campaign and up to our historic public announcement this December.

1998-1999
Arena Stage considers relocating to Seventh Street, NW, but after discussions with Mayor Anthony Williams and the City Council, decides to stay in Southwest as a crucial part of the Southwest Waterfront revitalization.

2000
June: Arena Stage reviews 60 architects as candidates to design the new complex and selects Bing Thom Architects of Vancouver, Canada.
July: Arena Stage completes its fundraising feasibility study.

2001
Arena Stage completes its engineering study.

2002
July: The design of Arena’s new theater campus by Bing Thom Architects is approved by both the Historic Preservation Review Board and the Fine Arts Commission.
September: Arena Stage receives the Mayor’s Agent Approval for Exemplary Architecture.
October: Arena Stage begins the quiet phase of its fundraising campaign.

2003
January: Arena Stage selects a Trustee leadership group and Campaign Steering Committee led by John M. Derrick, Jr., Wendy Farrow Raines and Richard W. Snowdon to serve as its campaign leadership.
June: Arena Stage receives approval of zoning variances by the Advisory Neighborhood Commission.
October: Bing Thom Architects’ final design is approved by the Board of Zoning Adjustments.

2004
Arena Stage files for the needed permits for the renovation project.

2005
Bing Thom Architects completes construction drawings.

2006
December: Arena Stage publicly launches The Next Stage Campaign and begins the bid process for the construction contract.


May: Clark Construction chosen for the construction contract.
October: Arena Stage Board of Trustees votes to commence construction, and announces plans to break ground in January of 2008.
December: Performances of Ella begin at Arena Stage in Crystal City, Virginia, the temporary theater space Arena will use during the two-year construction in Southwest, D.C.


January: Arena Stage breaks ground on its historic Southwest, D.C. theater complex


Fall: The Arena Stage Mead Center for American Theater opens for the 2010/2011 season.